County Road 22 Reconstruction: Notice of Public Consultation Centre
Notice of Public Consultation Centre
County of Essex and Municipality of Lakeshore
County Road 22 Reconstruction
Introduction
The County of Essex, in partnership with the Municipality of Lakeshore, has retained BT Engineering Inc. to design County Road 22 from I.C. Roy Drive to West Belle River Road. The design incorporates improvements that are in accordance with the recommendations of the County Road 22 Environmental Assessment Study (2006) and the County Road 22 Corridor Alternatives and Strategies Study (2022). The project will include a multi-use path on the south side of County Road 22, a sidewalk on the north side and separated cycle tracks to support active transportation within the corridor. Construction will be staged in two contracts as shown below.
Study Process
Based on the previous studies the project has Environmental Assessment clearance and will proceed to construction. This is a Schedule C project under the Municipal Class Environmental Assessment and includes the preparation of contract documents for the tender and subsequent construction of the project. The project will include active transportation improvements, consolidation of accesses along the arterial road corridor, new municipal services, new traffic signals, illumination, pavement improvements and property acquisition. The detailed design will be presented to the public for comment at this Public Consultation Centre.
Public Consultation Centre
The County of Essex and Municipality of Lakeshore will hold an in-person Public Consultation Centre to present the detailed design and receive input:
Date: June 18, 2024
Time: 6:30 p.m. to 8:30 p.m.
Location: Atlas Tube Recreation Centre - Renaud Room, 447 Renaud Line, Belle River, Ontario N0R 1A0
Anyone with an interest in the project can provide input. There is an opportunity at any time during the Class Environmental Assessment process for interested persons to provide comments. Early identification of individual and group concerns greatly aids in addressing these concerns.
Information and updates are posted on the project web page: countyofessex.ca/CR22
Notice of Collection
Personal information collected as a result of this public consultation centre is collected under the authority of the Municipal Act, the Municipal Freedom of Information and Protection of Privacy Act (MFIPPA), the Planning Act, and all other relevant legislation, and will be used to assist in making a decision on this matter. All personal information (as defined by MFIPPA), including (but not limited to) names, addresses, opinions and comments collected will be made available for public disclosure to members of the public through requests and through the County of Essex website. Questions regarding the collection, use and disclosure of this personal information may be directed to the Clerk, Essex County Civic Centre; 360 Fairview Avenue West, Essex, ON, N8M 1Y6.
Contacts
Please contact any of the following for more information or if you wish to be placed on the project’s contact list:
Steve Taylor, P.Eng., M.Eng.
Consultant Project Manager
BT Engineering Inc.
509 Talbot Street
London, Ontario N6A 2S5
519-672-2222
stevenj.taylor@bteng.ca
County of Essex
Infrastructure and Planning Services
360 Fairview Avenue West
Essex, Ontario N8M 1Y6
519-776-6441
engineering@countyofessex.ca
Krystal Kalbol, P.Eng.
Corporate Leader – Operations
Municipality of Lakeshore
419 Notre Dame Street
Belle River, Ontario N8L 0P8
519-728-1975 ext. 655
kkalbol@lakeshore.ca